<nav id="ooo0o"><sup id="ooo0o"></sup></nav>
<noscript id="ooo0o"></noscript>
    • <tfoot id="ooo0o"><dd id="ooo0o"></dd></tfoot><nav id="ooo0o"></nav>
      
      
    • <tfoot id="ooo0o"><dd id="ooo0o"></dd></tfoot>
    • 成人免费ā片在线观看,国产亚洲日韩在线播放更多,青草青草久热国产精品,欧美不卡一区二区三区

      How to use electric sintering furnace correctly?

      2021-11-29 1653

        1: Check whether the circuit and water circuit of sintering furnace are normal, such as normal power on and water supply.

        2: Open the mechanical pump, slowly open the pre pumping valve after 30 seconds, and open the front stage valve after 1 minute.

        3: When the vacuum degree reaches below 10Pa, turn over the lax pump and heat the lax pump

        4: After the lax pump is heated to 60 minutes, close the pre pumping valve and open the high vacuum valve, and the vacuum will gradually reach the high vacuum.

        5: For heating initiation, please select Manual heating below 200 degrees. In the manual operation menu of the control panel, pay attention to that when you use it once, the dial button is not firm up and down once, and then dial it to the manual position to initiate heating. Enter about 50. Automatic heating when the current is normally controlled below 300A: set the temperature control meter in the temperature control interface to automatically start heating or open the manual position to start heating manually. The above setting clarifies that it takes 120 minutes from 200 degrees to 600 degrees, 30 minutes from 600 degrees, 130 minutes from 600 degrees to 1000 degrees, 5 hours at 1000 degrees, 60 minutes from 1000 degrees to 600 degrees, and the program will continue automatically after 60 minutes (Note: Set - 121 in time, and the program will continue automatically here). After setting the heating process, first heat continuously manually, then turn the dial button to the automatic position to initiate the automatic heating program. If the data needs to be recorded, please mark "√" at the data storage meeting.

        6: In the heat preservation state, the normal circulation of circulating water shall be adhered to.

        7: When the holding time is up, turn off the heating switch. Assuming that high vacuum is not required, close the slack pump, open the pre pumping valve, close the high vacuum valve and start cooling. Caution: do not turn off the mechanical pump

        8: When the temperature drops to 200 ℃, turn off the mechanical pump (the lax pump reaches the normal temperature) and close all valves.

        9: Release the pressure at room temperature, rush in the air and take out the raw materials.

        10: If the operation is not continued, open the mechanical pump and pre pumping valve, vacuum for another 5 minutes, and close the mechanical pump and pre pumping valve. Adhere to the vacuum degree in the operation room to avoid water vapor intrusion.

        11. Pressure operation: first, in the manual operation interface, the pressure reporting form is set to the automatic position, which can be operated directly with the instrument. After setting the program, press the run key for 3 seconds, and press the stop key for 3 seconds.

        Article from:http://m.candybus.com.cn

      主站蜘蛛池模板: 免费午夜福利在线观看不卡| 久久人人爽人人爽人人片dvd| 亚洲综合色成在线播放| 精品国产一区二区三区www| 国产精品视频色尤物yw| 亚洲精品电影院| 国产精品久久人妻无码网站蜜臀 | 中文字幕久久久久人妻中出| 国产成人无码a区在线| 久久久久se色偷偷亚洲精品av| 丝袜无码一区二区三区| 伊人久久精品av一区二区| 久久综合久久美利坚合众国| 亚洲精品久久久久avwww潮水| 久久久噜噜噜| 亚洲伦无码中文字幕另类| 亚洲日产韩国一二三四区| 国产欧美中文字幕| 色成人精品免费视频| 免费的黄网站在线观看| 亚洲成a人片77777在线播放| 国产无内肉丝精品视频| 免费无码专区在线视频| 亚洲色大成网站www应用| 无码专区—va亚洲v专区vr| 欧洲黑大粗无码免费| 人摸人人人澡人人超碰手机版| 国产aⅴ无码久久丝袜美腿| 亚洲人成人无码www影院| 日韩精品一区二区三区中文不卡| 欧美交换配乱吟粗大视频| 国产精品成人网站| 无码熟妇人妻在线视频| 亚洲精品人成网线在线| 久久99精品久久久久麻豆| 国产亚洲色婷婷久久99精品 | 精品人妻无码视频中文字幕一区二区三区 | 亚洲欧美人成电影在线观看| 国产亚洲精品一区二区三区| 人人揉揉揉香蕉大免费| 咸阳市|